EFC Models

Bridge Demolition

Page one 

 

 

 

This is a very small contract that was won by EFC for a retaining wall. 

Day One

Unloading the Bobcat 325 

Starting on the first of five foundations

The 325 sunk in the soft soil we will have to fix that. 

Whit no other equipment on the site yet we had to hand dig all of dirt away from the machine by hand. 

Finally got the 325 out. Now it is time to fill in the ruts. 

The last pole foundation is being dug at the end of the day. 

This is a frustrating end to the day as the pickup got stuck. 

 Hopefully we will get this out of here before the sun sets.